Discover how HUDU Insight and HUDU Lab can transform your construction project economics
£ Project Details
✓ Projected Savings
How We Calculate These Savings
Coordination Rework 70%
HUDU Insight catches 90% of potential issues during design phase that could otherwise reach construction. On-site fixes cost 5-10x more than design corrections. HUDU's continuous monitoring eliminates 70% of typical coordination-related rework costs.
Variation Orders 35%
Industry data shows VOs add 10-18% to contract values. HUDU Insight prevents 35% of total VOs by catching design inconsistencies, ambiguities, and omissions before they become expensive on-site changes.
Search Efficiency 80%
Team members typically spend 1.5-2 hours daily searching documents. HUDU Insight reduces this to 15 minutes through instant retrieval and cross-referencing. That's 1.4 hours per engineer per day redirected to value-adding work.
IMPORTANT DISCLAIMER: These calculations are provided for illustrative and indicative purposes only. The projected savings shown by this calculator are estimates based on industry averages and assumed baseline costs. Actual results will vary significantly depending on your specific project circumstances, existing processes, team capabilities, project complexity, and numerous other factors.
By using this calculator, you acknowledge that you understand and accept these limitations and all terms as stated in our Legal and Compliance section and will not rely on the calculations as a guarantee of future performance or outcomes.